BIBLIOGRAPHIC DATA |
(11) Patent Number | 035118 |
Date of Registration in the Register of Eurasian Patents | 2020.04.28 |
(21) Application Number | 201790762 |
(22) Filling Date | 2017.04.28 |
(51) IPC |
B01D 53/00 (2006.01)
B01D 53/22 (2006.01)
C01B 23/00 (2006.01)
F25J 3/06 (2006.01) |
(43)(13) Application Publication Date(s), Kind Code(s) | A2 2017.10.31 Issue No 10 title, specification A3 2017.12.29 Issue No 12 title, specification
|
(45)(13) Patent Publication Date(s), Kind Code(s) | B1 2020.04.29 Issue No 04 title, specification B9 2020.06.30 Issue No 06 title, specification
|
(31) Number(s) assigned to Priority Application(s) | 16000961.9
|
(32) Date(s) of filing of Priority Application(s) | 2016.04.28
|
(33) Priority Application Office | EP
|
(71) Applicant(s) | ЛИНДЕ АКЦИЕНГЕЗЕЛЬШАФТ (DE) |
(72) Inventor(s) | Келлер Тобиас, Восс Кристиан, Байер Мартин, Енневайн Франк (DE) |
(73) Patent Owner(s) | ЛИНДЕ АКЦИЕНГЕЗЕЛЬШАФТ (DE) |
(54) Title | СПОСОБ И ПРОМЫШЛЕННАЯ УСТАНОВКА ДЛЯ ПОЛУЧЕНИЯ ГЕЛИЯ ИЗ СОДЕРЖАЩЕГО ГЕЛИЙ ИСХОДНОГО ГАЗА |
|
REPRESENTATIVES |
Patent Owner's Representative(s) | ПОЛИКАРПОВ Александр Викторович (RU),СОКОЛОВА Марина Владимировна (RU),ПУТИНЦЕВ Алексей Игоревич (RU),ЧЕРКАС Дмитрий Александрович (RU),ИГНАТЬЕВ Алексей Владимирович (RU),БИЛЫК Александр Владимирович (RU) |
Correspondence Address | ЗАО "НЕВИНПАТ"пер. Пирогова, д. 7, г. Санкт-Петербург, Россия, 190000 |
|
INFORMATION ON LEGAL STATUS CHANGES |
MM4A Lapse of a Eurasian patent in a Contracting State due to non-payment within the time limit of renewal fees | Issue: 2021-11 Date: 2021.11.24 | Code of state, where the patent has lapsed: AM, AZ, KG, KZ, TJ, TM
Lapse date: 2021.04.29.
|
TH4A Reprint of the description of invention in a Eurasian patent (list of corrections applied, B9 publication) | Issue: 2020-06 Date: 2020.06.30 | Следует читать: (57) ... 2. Способ по п.1, в котором первый поток (9) пермеата в мембранном блоке (4) подают в устройство (12) адсорбции при переменном давлении (Не АПД), ...
|
|
VALIDITY IN CONTRACTING STATES AND THE REPUBLIC OF MOLDOVA |
First annual fee payment due date | 2021.04.28 | Validity of the patent in the territory of Contracting States and the Republic of Moldova |
Year | Period |
AM | AZ | BY | KG | KZ | RU | TJ | TM |
1 | 2017.04.28 - 2018.04.28 | √ | √ | √ | √ | √ | √ | √ | √ | 2 | 2018.04.29 - 2019.04.28 | √ | √ | √ | √ | √ | √ | √ | √ | 3 | 2019.04.29 - 2020.04.28 | √ | √ | √ | √ | √ | √ | √ | √ | 4 | 2020.04.29 - 2021.04.28 | √ | √ | √ | √ | √ | √ | √ | √ | 5 | 2021.04.29 - 2022.04.28 | - | - | √ | - | - | √ | - | - | 6 | 2022.04.29 - 2023.04.28 | - | - | √ | - | - | √ | - | - | 7 | 2023.04.29 - 2024.04.28 | - | - | √ | - | - | √ | - | - | 8 | 2024.04.29 - 2025.04.28 | - | - | √ | - | - | √ | - | - |
|
|
|